Black & Decker The Complete Guide to Wiring by Editors of Cpi

Black & Decker The Complete Guide to Wiring by Editors of Cpi

Author:Editors of Cpi
Language: eng
Format: epub
Publisher: Creative Publishing international
Published: 2011-01-28T05:00:00+00:00


Update the conduit that runs from your house to the bottom of the meter base. This should be 2" rigid conduit in good repair. Attach the conduit to the base and wall with the correct fittings. Rigid metal conduit is a good option, but Schedule 80 PVC is probably the best choice for housing the service entry cables.

Install new service entry wires. Each wire carries 120 volts of current from the meter to the service wire lugs at the top of your service panel. Code is very specific about how these connections are made. In most cases, you’ll need to tighten the terminal nuts with a specific amount of torque that requires a torque wrench to measure. Also attach the sheathed neutral wire to the neutral/grounding lug.



Download



Copyright Disclaimer:
This site does not store any files on its server. We only index and link to content provided by other sites. Please contact the content providers to delete copyright contents if any and email us, we'll remove relevant links or contents immediately.